Skip to content
Unit 2, Sedgeway Equestrian Centre, Sedgeway Business Park, Common Road, Witchford, Ely, CB6 2HY
Facebook page opens in new windowX page opens in new windowYouTube page opens in new window
info@ecoinstaller.co.uk01353 669000
Search:
Eco Installer
Energy Efficiency Company in Witchford, Cambridgeshire
Eco Installer
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate
Site Survey
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate

Category Archives: Air to Air Heat Pump

You are here:
  1. Home
  2. All Case Studies
  3. Category "Air to Air Heat Pump"

Air-Con-Panasonic-Eco-Installer-Ely-Cambs

Panasonic Air Conditioning Units

Air to Air Heat Pump, All Case StudiesBy Rebecca HubbardNovember 21, 2017

Installation: 2 x Panasonic Air Conditioning Units Location: Ely, Cambridgeshire Date: July 2017 Project Details: Jacqui from Fenland Physio contacted us with an interest in having an air conditioning system installed in the treatment rooms. After giving Jacqui some information over the phone, a meeting was arranged for Roly to visit the practice and check…

Air-con-corkerscrisps-Ecoinstaller-ely

2 x Panasonic Air Conditioning Units

Air to Air Heat Pump, All Case StudiesBy Rebecca HubbardOctober 10, 2017

Date: Summer 2017 Installation: 2 x Panasonic Air Conditioning Units Project details: Rod, one of the owners of Corkers Crisps gave us a call with an interest in having an air conditioning system installed at his busy farm office in Little Downham. Rod explained that the main office at the farm gets very hot during…

Panasoninc_Aircon_EcoInstaller_Cambs

Panasonic Air Conditioning Installation

Air to Air Heat Pump, All Case StudiesBy Rebecca HubbardAugust 7, 2017

Installation Panasonic Air to Air Heat Pump (For heating and air conditioning) Location Little Downham Village Hall, Cambridgeshire Date: July 2017 Project details: Little Downham Village Hall, a multi-functional facility at the heart of Donwham Parish is regularly used for private and communal events throughout the year, including parties, exercise classes and baby groups. After…

Panasonic-square-eco-installer-ely

16kW Panasonic Aquarea Air Source Heat Pump

Air to Air Heat Pump, All Case StudiesBy Rebecca HubbardMarch 22, 2017

Installation: 16kW Panasonic Aquarea Air Source Heat Pump Location Huntingdon, Cambridgeshire Date: January 2017 Project details: Chris was at the early stages of a self-build project in Huntingdon when he gave us a call. Chris explained he wanted the new family home to be as green as possible and was keen to explore the possibility…

air-to-air-heat-pump-eco-installer-ely-cambs

5kW Panasonic Air to Air Heat Pump

Air to Air Heat Pump, All Case StudiesBy Rebecca HubbardNovember 25, 2016

Installation: 5kW Panasonic Air to Air Heat Pump, Providing Heating and Cooling Location: Sawtry, Cambridgeshire Date: November 2016 Project details: Mr Bamford gave us a call and explained he had seen a Panasonic Air to Air Heat Pump demonstration and was impressed with the effeciency of the system. Mr Bamford was keen to see if the…

Panasonic Air to Air Heat Pump Installation

Air to Air Heat Pump, All Case StudiesBy Rebecca HubbardNovember 9, 2016

Installation: Panasonic Air to Air Heat Pump Location March, Cambridgeshire Date: November 2016 Project details: Steve transformed an outbuilding in to a personal gym and had been searching for some time for a heating system to comfortably warm the building. As the outbuilding had no plumbing or access to water, Steve was struggling to find…

←12←
Go to Top