Skip to content
Unit 2, Sedgeway Equestrian Centre, Sedgeway Business Park, Common Road, Witchford, Ely, CB6 2HY
Facebook page opens in new windowX page opens in new windowYouTube page opens in new window
info@ecoinstaller.co.uk01353 669000
Search:
Eco Installer
Energy Efficiency Company in Witchford, Cambridgeshire
Eco Installer
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate
Site Survey
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate

Author Archives: Rebecca Hubbard

You are here:
  1. Home
  2. Article author Rebecca Hubbard

Solar-installation-Eco-Installer

4kW / 16 panel Solar Panel Installation – Little Downham

All Case Studies, Solar Case StudiesBy Rebecca HubbardDecember 15, 2015

Date: Winter 2015 Installation: 4kW / 16 panel Solar Panel Installation Location: St Ives Payback Period: 9 Years Due to the rising cost of energy prices, Mr & Mrs Syms were looking for a way to reduce their energy bills. In addition, they were keen to investigate the suitability of a solar Photovoltaic  (PV) system…

Go to Top