Skip to content
Unit 2, Sedgeway Equestrian Centre, Sedgeway Business Park, Common Road, Witchford, Ely, CB6 2HY
Facebook page opens in new windowX page opens in new windowYouTube page opens in new window
info@ecoinstaller.co.uk01353 669000
Search:
Eco Installer
Energy Efficiency Company in Witchford, Cambridgeshire
Eco Installer
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate
Site Survey
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate

Monthly Archives: February 2020

You are here:
  1. Home
  2. 2020
  3. February

Heat Pump to replace gas heating, Eco Installer

Air Source Heat Pump To Replace Gas Central Heating

All Case Studies, ASHP Case StudiesBy Rebecca HubbardFebruary 21, 2020

Date: Winter 2019 Installation: NIBE 8kW Air Source Heat Pump NIBE SMO 20 Controller Hot water cylinder New radiators Location: Histon Cambridge Project details: Back in 2016 we installed a solar photovoltaic system for Norman to reduce his energy bills. We enjoyed working with him then and was delighted to hear from him again when…

The gift that keeps on giving….for 7 years!

Blog PostsBy Rebecca HubbardFebruary 20, 2020

We all love to be rewarded for the good things we do, whether that’s chocolate, treats or freebies. That’s why we’re all talking about the RHI. Read on to learn more about an incentive that might be even tastier than chocolate for your wallet!

Mitsubishi Heat Pump Install, Eco Installer, Ely

Mitsubishi EcoDan 8.5kW Air Source Heat Pump Installation

All Case Studies, ASHP Case StudiesBy Rebecca HubbardFebruary 7, 2020

Installation: –          Mitsubishi EcoDan 8.5kW Air Source Heat Pump –          250 litre pre-plumber cylinder Location: Wardy Hill, Ely, Cambridgeshire Project details: Wardy Hill is in a beautiful part of the Cambridgeshire fens. Retired Commissioned Officer, Jonny has lived here for more than 4 years and top of…

Go to Top