Skip to content
Unit 2, Sedgeway Equestrian Centre, Sedgeway Business Park, Common Road, Witchford, Ely, CB6 2HY
Facebook page opens in new windowX page opens in new windowYouTube page opens in new window
info@ecoinstaller.co.uk01353 669000
Search:
Eco Installer
Energy Efficiency Company in Witchford, Cambridgeshire
Eco Installer
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate
Site Survey
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate

Daily Archives: September 16, 2015

You are here:
  1. Home
  2. 2015
  3. September
  4. 16

Boat-front-Earith-Eco-Installer-Cambridge

4kW Solar Installation on a Narrow Boat

All Case Studies, Renewables Case Studies, Solar Case StudiesBy ecoinstallerSeptember 16, 2015

Period: Summer 2015 Installation: 4kW Solar installation on a narrow boat Payback period: 7.5 Years Project details: We met Les when exhibiting at the Haddenham Steam Rally. He explained that he already had solar panels on portakabins by his house and asked the question if it would be possible to install a solar array on…

Go to Top