Skip to content
Unit 2, Sedgeway Equestrian Centre, Sedgeway Business Park, Common Road, Witchford, Ely, CB6 2HY
Facebook page opens in new windowX page opens in new windowYouTube page opens in new window
info@ecoinstaller.co.uk01353 669000
Search:
Eco Installer
Energy Efficiency Company in Witchford, Cambridgeshire
Eco Installer
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate
Site Survey
  • Heating
    • Air to Water & Ground Source Heat Pumps
    • Air to Air Systems
    • Underfloor Heating
    • JK Floorheating
  • Renewable
    • Boiler Upgrade Scheme (BUS)
    • Air Source Heat Pumps
    • Ground Source Heat Pumps
    • Solar Panel Installations
    • Sunamp
    • Solar Assisted Heat Pump
    • Solar Batteries
    • Underfloor Heating
    • Government Funding
    • MCS Design & Installation
    • Solar Budgetary Prices
  • Ventilation
    • Mechanical Ventilation with Heat Recovery
  • Annual Servicing
    • Heat Pump Servicing
    • Solar Thermal Servicing
    • Air to Air Heat Pump Servicing
  • The Team
  • Contact Us
    • Showroom and Office
    • Eco Installer Terms and Conditions
    • Project Checklist (For Eco Installer Customers Only)
    • Blog
    • All Case Studies
  • Free Estimate

Daily Archives: November 12, 2013

You are here:
  1. Home
  2. 2013
  3. November
  4. 12

New bath

New Build Bathroom Install

All Case Studies, Plumbing Case StudiesBy ecoinstallerNovember 12, 2013

Period: Summer 2013 Project Details: Bathrooms for a high-end new build Size of installation: Main bathroom and en-suit Details: The customer contacted us half way through the development of their new home to discuss the installation of bathrooms. We worked closely with Cambridgeshire Bathrooms, the bath room supplier and designer to ensure our customer was getting…

South facing Solar roof

4kW Solar PV Installation

All Case Studies, Solar Case StudiesBy ecoinstallerNovember 12, 2013

Period Winter 2013 Project Details 4kW Solar PV Panel Installation – South facing roof Size of installation 3400 kWh per annum “green energy” generation Payback period 6.6 years Details Our client had been improving his property with wall and loft installation, plus the latest energy efficient windows and doors. We were contacted to help with…

Go to Top